Stacked steel pipes

CSCase study · Heat treatment

Normalised flanges for a district heating grid

Client[Client name] district energy
LocationAarhus, DK
CategoryHeat treatment
Duration5 weeks
CompletedOctober 2025

01The brief

Three hundred flanges, normalised batch by batch

A district heating grid extension needed flanges from DN 300 to DN 800 with impact values proven for every heat.

We forged the flanges, normalised them in batches in furnaces surveyed to AMS 2750 and machined them to EN 1092-1. Batch charts and impact results were issued per heat.

02What we did

Forged, normalised, machined, tested

  • Forged 300 flanges from DN 300 to DN 800
  • Normalised in batches with a calibrated chart for every load
  • Machined faces and bolt holes to EN 1092-1
  • Impact tested every heat and issued the results with the 3.1 certificate
5wksFrom order to the last delivery
300pcsFlanges forged and normalised
0NCRsRaised by the customer
“One certificate per heat, one chart per batch. Our inspector signed off the whole order in a morning.”
ASA. SørensenProcurement engineer, district energy
Buy Theme - $49 Launch It For Me