Certified melt shop
ISO 9001 plant. EN 10204 3.1 certificates issued with every heat and signed off by our own lab.

01Steel & alloy works · Since 1976
Melting, casting, forging and machining on one site. Every heat is sampled, logged and certified before a single part leaves the gate.

02Structural fabrication
Frames, girders and pressure parts built by coded welders, blasted and coated in-house, and shipped with a full weld map.

03Foundry · 50 kg to 12 t pours
Carbon, alloy and stainless castings, heat treated in furnaces surveyed to AMS 2750 and machined to ±0.01 mm.
ISO 9001 plant. EN 10204 3.1 certificates issued with every heat and signed off by our own lab.
Twelve furnaces up to 1,150 °C, each with a calibrated temperature trace kept for ten years.
Finished parts to ±0.01 mm, measured on CMM and shipped with the inspection report.


01About the works
We melt, pour, forge and finish steel and alloy parts for rail, energy, mining and marine customers who need the chemistry right the first time.
Founded in 1976 as a two-furnace jobbing foundry, we now run melting, forging, heat treatment and machining on one 14-hectare site in Deventer.
To supply metal parts whose chemistry, structure and dimensions are proven before they leave the gate, on the date we agreed.
ISO 9001, ISO 14001, ISO 45001 and EN 1090 EXC3, audited every year by independent third parties.

Plant tour · embed your YouTube or Vimeo link here
02What we do
Keeping every step under one roof means one schedule, one quality system and one heat number that follows your part from ladle to loading bay.
03Why the works
No add-ons and no premium tier. This is the standard for a single casting or a five-year framework contract.
Alloy questions are answered by the people running the melt, not by a call centre.
01Every bar, casting and forging carries the heat it was poured from, stamped on the part and on paper.
02Spectrometry, tensile, impact and hardness testing on site, usually the same day.
03Delivery dates confirmed in writing and tracked weekly until the truck leaves the yard.
04Certificates, packing lists and customs documents prepared in-house for shipments worldwide.
05ISO 45001 audited. Every visitor, driver and contractor is inducted before the gate opens.
06
05Our work

06Testimonials
“They re-poured a rejected batch of 42CrMo4 flanges in nine days and sent the melt report before the parts arrived. That is how a supplier earns a framework contract.”
“The 3.1 certificates match the heat numbers on every bar. Our incoming inspection went from two days to two hours.”
“Casting, heat treatment and machining from one supplier means one schedule to chase. That alone was worth the switch.”
07News & insights
Choose a demo, import it in minutes, and customize it to fit your brand.
