Next service
CNC machining
5-axis milling and turning up to 4 m, with CMM inspection before anything is packed.

03Service

Quench and temper, normalising, annealing, stress relief and case hardening in twelve furnaces surveyed to AMS 2750.
Gas and electric furnaces up to 6 m long cover everything from a single flange to a 25 t shaft. Every load is logged with thermocouple positions, times and temperatures, and the chart ships with the parts.
We heat treat parts made elsewhere too, with exactly the same records and the same lab testing.
Every load ships with the furnace chart, thermocouple positions and times.
We temper to the hardness window you need, then prove it on the part.
Heat treatment for parts made elsewhere, with the same records and testing.


Yes, with the same records. Send the grade, required properties and part weight.
Stress relief is usually 48 hours. Quench and temper with testing takes five to seven working days.
Customer and third-party witnessing is welcome. Book at least three working days ahead.
Next service
5-axis milling and turning up to 4 m, with CMM inspection before anything is packed.

Choose a demo, import it in minutes, and customize it to fit your brand.
