Journal
Notes from the shop floor
Short pieces on tolerances, remanufacturing and what we learned the hard way.

Metrology2026 · 09 · 02
Why we measure the first article twice
Once on the machine, once in the cold room. The difference is usually 6 µm — and sometimes it is the difference between a batch…

Remanufacturing2026 · 07 · 18
A gearbox housing, three lives
One part number, followed from first machining in 2011 through two remanufacturing cycles to the melt in 2026.

Fabrication2026 · 06 · 04
Stress relief after welding: the flatness numbers
What a 4-metre base does overnight in the furnace, measured before and after.

Materials2026 · 04 · 22
Sorting swarf by alloy pays for itself
Mixed swarf is worth a third of segregated. The bins cost less than one month of the difference.

Production2026 · 03 · 10
Lights-out: what the robot cell actually does at 03:00
A night on the pallet cell, in numbers: parts, tool changes, one alarm.

Materials2026 · 01 · 27
Reading a 3.1 certificate
Which lines matter, which do not, and the one that is most often wrong.

Remanufacturing2025 · 11 · 14
Remanufacturing a spindle to IT5
Grinding, balancing and the bearing seats nobody wants to talk about.